A good RFQ gives the manufacturer everything needed to price your part correctly on the first reply: the drawing, material, annual volume, quality requirements and delivery terms. Missing any of these usually means a round of clarifying emails, a slower quote, or a quote that changes later.
This guide lists exactly what to include, why each item matters, and a template you can copy.
A manufacturer cannot price a part from a photo or a one-line description. To quote, the engineering and costing team must work out:
Every gap in your RFQ forces the supplier to guess or to stop and ask. Guessing leads to quotes that don’t match what you wanted. Asking adds days.
Why it matters: tolerance decides the process route. A feature held to a few microns may need grinding after turning, while a looser one may be achievable straight from forging.
Why it matters: material is usually the largest part of the cost, and the grade affects forming, machining and heat-treatment choices. Cold-forging-grade steels behave differently from general machining grades.
Why it matters: volume decides whether forging with dedicated tooling makes sense or whether machining from a bar is more economical. A part needing thousands per month is priced very differently from a few hundred per year. For how that trade-off works, see cold forging vs hot forging.
Why it matters: each extra operation adds cost, lead time and a chance for variation. Listing them up front avoids a second quote later.
Why it matters: quality documents take effort to produce. A supplier who knows the requirement can price it in rather than surprise you later.
| Item | Must Have | Nice to Have |
|---|---|---|
| Drawing | 2D with tolerances and revision | 3D STEP file |
| Material | Grade and standard | Acceptable substitutes |
| Volume | Annual quantity | Release schedule, SOP date |
| Processes | Heat treatment, coating, finishing | Surface roughness targets |
| Quality | Inspection and certificate needs | PPAP level, sampling plan |
| Delivery | Location, packing | Delivery terms, payment terms |
| Commercial | Quote deadline | Target price, tooling ownership |
A typical sequence at a manufacturer:
A supplier who asks sensible questions at step 1 is usually a good sign. It means they are reading the drawing, not just quoting a number.
Subject: RFQ – [Part name] – [Part number]
Hello,
Please quote for the following part.
Part name / number:
Drawing revision: (attached, PDF; STEP file if available)
Material and standard:
Annual volume:
Batch size / release schedule:
Sample quantity needed:
Expected start of production:
Heat treatment (hardness / case depth):
Surface treatment / finish:
Inspection and documents required: (e.g. dimensional report, material certificate, PPAP level)
Packaging:
Delivery location and terms:
Tooling: (customer-owned or included in price)
Quote needed by:
Thank you,
[Name, company, phone]
Accurate Bearing Components has made precision automotive components in Doddaballapur, Bangalore, since 1992. We work with cold forging, CNC turning, heat treatment and phosphate coating, and our quality system is audited to IATF 16949 and ISO 9001.
Send your drawing and details to ops@accuratebearing.in, or call +91 95357 42213. You can also use the contact page. Not sure whether your part suits forging or machining? Tell us the volume and tolerance and we will advise on the route. For the full range of parts we make, see our cold forged components.
At minimum: a 2D drawing with tolerances and revision, material grade, annual volume, heat-treatment and surface requirements, quality documents needed, and delivery location and terms.
No. A clear 2D drawing is the key document. A 3D STEP file is helpful, especially for forged parts, but it does not replace the drawing.
Volume decides the best process and whether dedicated tooling is worth building. The same part can be priced very differently at 500 pieces a year and at 50,000.
It is difficult. If you only have a sample part, a manufacturer can often measure it and prepare a drawing, but the quote will take longer and tolerances will need your confirmation.
An RFI (request for information) asks about a supplier's capabilities. An RFQ asks for a price on a defined part. Many buyers send an RFI first to shortlist suppliers, then an RFQ to the shortlist.
Share realistic volumes, tighten tolerances only where function needs it, allow equivalent materials where possible, and be open to the supplier's process suggestions.